Time is not additive, but work rates can be

If A completes one job in a days at a constant rate, A completes 1/a of the job per day. If B needs b days, B's rate is 1/b. When their contributions add without interference, their joint rate is 1/a + 1/b jobs per day.

Joint time = 1 / (1/a + 1/b) = ab/(a + b).

The formula assumes the same job, constant individual rates, and work that can be shared without slowing either worker. It does not automatically apply when the second worker must wait for the first or when the task cannot be divided. Adding a and b would describe neither simultaneous work nor their combined rate.

Two workers start together, then one leaves

A can finish a job in 12 days and B in 18 days. They work together for 3 days, then A leaves. How long does the entire job take if B finishes the remainder?

Choose a 36-unit job to avoid repeated fractions
WorkerSolo timeRate
A12 days3 units/day
B18 days2 units/day
Together36/5 days if both stay5 units/day

Thirty-six is a convenient common multiple, not a physical measurement of the job. The first 3 days complete 3 × 5 = 15 units. The remaining work is 36 − 15 = 21 units. B completes it in 21/2 = 10.5 more days, so the total elapsed time is 3 + 10.5 = 13.5 days.

As a check, A works for 3 days and contributes 9 units. B works for all 13.5 days and contributes 27 units. Their contributions sum to 36. The common mistake is to report 10.5 days as the total, forgetting the initial shared phase.

Three complete rate problems

1. A takes 10 days alone and B takes 15 days alone. How long do they need together under the stated assumptions?

Read the solution

Use a 30-unit job. A completes 3 units/day and B completes 2 units/day. Together they complete 5 units/day, so the time is 30/5 = 6 days. This is less than either solo time, as expected for two positive additive rates.

2. A and B together take 8 days. A alone takes 12 days. How long does B take alone?

Read the solution

B's rate is 1/8 − 1/12 = (3 − 2)/24 = 1/24 jobs per day. Therefore B needs 24 days alone. Subtracting the times, 12 − 8 = 4, would subtract unlike contributions rather than rates.

3. A takes 6 days alone and B takes 12. They work together for 2 days, then B leaves. Find the total time.

Read the solution

Their joint rate is 1/6 + 1/12 = 1/4 jobs/day. They finish half the job in 2 days. A needs (1/2)/(1/6) = 3 more days, giving 5 days in total. Check: A contributes 5/6 and B contributes 2/12 = 1/6, totaling one job.

Alternating days: stop when the job finishes, not at the end of a cycle

A completes one job in 6 working days and B in 8 working days. They work on alternate days, A first. Each scheduled day is one full work interval, and either worker may stop partway through an interval when the job is finished. Their rates are constant and there are no waiting intervals between the scheduled days. Find the elapsed time in these work-day units.

Use a 24-unit job. A does 4 units per day and B does 3. A two-day cycle completes 7 units. After three complete cycles, 6 days have elapsed and 21 units are finished. There are only 3 units left. Day 7 belongs to A, who needs 3/4 of a day to finish them. Total time is 6 + 3/4 = 6.75 days.

Track the last partial day explicitly
PhaseTime usedWork completed
Three A-then-B cycles6 days3 × (4 + 3) = 21 units
Final A turn3/4 day4 × 3/4 = 3 units
Total6.75 days24 units

Dividing 24 by the two-day average rate 7/2 gives 48/7 days, but that treats the last incomplete cycle as if both workers contributed proportionally. They do not: A finishes the task before B's next turn. Check another way: A works for 3.75 days and supplies 15 units; B works for 3 days and supplies 9 units. The total is exactly 24.

Does the starting worker matter?

Keep the same rates but let B work first. Find the total time. Do not assume the order is irrelevant just because a complete cycle still produces 7 units.

Inspect the remaining work after six days

After three B-then-A cycles, 21 units are complete in 6 days. B works next at 3 units/day, so the remaining 3 units take exactly 1 day. Total time is 7 days. The complete-cycle output is unchanged, but the worker available for the final remainder is different. If a question asks only which day completion occurs on, both schedules finish during day 7; if it asks elapsed duration, 6.75 and 7 are different answers.

Draw a new phase whenever the rate changes

For each phase, record who is working, the rate, the elapsed time and the work completed. Subtract completed work from one whole job before starting the next phase. Keep units explicit: jobs/day multiplied by days gives jobs, while jobs divided by jobs/day gives days.

Scope and provenance

TeamCat created these elementary mathematics exercises for CDS preparation. They are not past UPSC questions. The solutions use only work = rate × time and the explicit constant-rate assumptions. A “day” is a mathematical time unit here, not an assumption about a real employee's working hours.